Invitation for Bid: Casa Madrona Boiler System Upgrade Re-bid

Posted

06/07/2024

Description

The King County Housing Authority will accept Bids from Qualified General Contractors to furnish labor, materials and necessary equipment to perform boiler system upgrades as listed in the bid documents.

Scope of Work

Work will be performed in occupied spaces, and the Contractor must coordinate with KCHA during this process to ensure that the residents have egress and access and limited disruptions. The Contractor will be replacing, installing, testing, and commissioning (including but not limited to) the following items:

-Remove and replace Circuit Setters located in the boiler room, balancing each primary loop circuit setter valve.
-Provide test ports on each side of the valves and insulate. -Rebalance valves to meet flow requirements.
- Install insulation where missing in the boiler room to boiler loops and waterlines
- Adjust the Boiler reset schedule per note 2 on M1.5 on plans.
- Insulate air separator
- Demolish piping as needed and provide Y-Strainers at inlet to boiler pumps and hydronic pumps
- Reprogram pump VFDs to correctly respond to hydronic differential pressure sensors.
- Relocate hydronic piping sensor from inside the mechanical towards end of supply line.
- Install new pressure test ports on each side of the primary loop pumps
- Provide a water loop analysis and chemical treatment plan.
- Relocate outside air temperature sensor and provide sun shield Reset and balance the flow control valves on every hydronic heater inside the building.
- Verify all T stats and solenoids are in working order after balancing is completed.
- Provide all documents required in provided spec sections
Prior to starting flushing and cleaning process, system shall be hydrostatically tested, flush entire system in accordance with spec section 232500
- Chemically treat and refill piping system at the end of the job, provide KCHA with all testing and balancing reports or any other reports required per the specs.

Project Manual Distribution Packet

Date of issue: 06/07/2024. Bid documents and drawings are attached.

Pre-Bid Meeting

06/11/2024 at 11:00 a.m.
Casa Madrona
3948 Martin Way East, Olympia, WA 98506

Pre-bid is MANDATORY.

Contact Person

Don Hatfield
Project Manager
206-574-1213
DonaldH@kcha.org

Question deadline: 06/18/2024 at 04:30 p.m.

Submission Deadline

06/25/2024 at 01:00 p.m.

Documents (PDF Format)

KCHA Casa Madrona Boiler System Upgrade - Bid Book
Posted: 06/07/2024 KCHA Casa Madrona Boiler System Upgrade - Drawings
Posted: 06/07/2024
KCHA Casa Madrona Boiler System Upgrade - Pre-Bid Sign in Sheet
Posted: 06/11/2024
KCHA Casa Madrona Boiler System Upgrade - Bid Results
Posted: 06/25/2024

Contractor Selected

Elite Mechanical Services, LLC
Contract amount: 149,742.00
Date selected: 07/22/2024

Main Office
600 Andover Park W.
Tukwila, WA 98188
Tel: (206) 574‑1100
Fax: (206) 574‑1104
TDD: (800) 833‑6388
Directions

Section 8 Office
700 Andover Park W.
Tukwila, WA 98188
Tel: (206) 214‑1300
Fax: (206) 243‑5927
Directions

Central Applications Center — Subsidized Housing
Tel: (206) 574‑1248
Fax: (206) 574‑1241